Flood Image
Flood Image
Flood Image
Flood Image
Flood Image
Super User

Super User

Learn More:

Streamflow and water level data are used to monitor flood and drought events. They are also used to monitor water supply for lake operation and navigation. This information is used to determine flood risk, support land use planning, assess fish habitat and for water quality analyses of contaminant loading.

 

DISCLAIMER:   Users of the RVCA flow data and water level data are cautioned to consider the unverified nature of the information before using it for decisions that concern personal or public safety or the conduct of business. The Rideau Valley Conservation Authority assumes no responsibility for the correctness of the information contained in this website nor liability to any user of such information, regardless of the purpose. River Levels and flows can change rapidly.

 

 

From October to December 2014 the landlocked Brewer Park Pond and former artificial swimming hole was reconnected to the main channel of the Rideau River. The newly connected pond boasts increased biodiversity with the creation of a new, vibrant wetland and pond with shoreline plantings, breeding bird habitat, amphibian habitat, turtle nesting beds and basking logs. The pond will provide improved spawning, nursery, rearing and feeding habitat for the local fish community in the Rideau all year round. This part of the Rideau River is home smallmouth bass, largemouth bass, yellow perch, northern pike, walleye and muskellunge.

Project Highlights:

  • 16,000 square metres of new, functioning wetland and fish habitat in the heart of the City of Ottawa
  • 1,000 truckloads of soil removed to contour pond into more productive habitat
  • 120 community volunteers helped plant over 1,600 trees, shrubs and aquatic plants in and around the pond
  • 8 weeks of construction from October to December 2014
  • Numerous basking logs, root wads and log piles installed as habitat for turtles, fish, amphibians

Ecological benefits:

  • Reconnected pond allows fish species year-round access in and out of the pond into the main river
  • Eliminates the potential for fish kills as a result of low oxygen conditions in the pond over winter and summer months
  • Altered elevations creates conditions suitable for more diverse aquatic vegetation
  • New functional spawning, nursery, rearing and food supply habitat created in the restored wetland for fish in the adjacent reach of the Rideau River
  • Provides new and enhanced winter and summer refuge areas for fish
  • Increased biodiversity.
  • Enhanced wetland improves water quality in the Rideau River

Project Partners

  • Fisheries and Oceans Canada
  • Fish Biology & Conservation Physiology Lab
  • Carleton University
  • Minto
  • Muskies Canada
  • MNRF
  • City of Ottawa
  • Ottawa South Community Association
  • Richcraft

Photo764
Photo761
July2011
IMGP3226
IMG20160715104955
IMG20150509094123
IMG20150509100123
IMG20150509081250
IMG20150126085404
IMG20141203152606
IMG20141128110847
IMG20141124092400
IMG20141113092005
IMG20141105104004
IMG201411051020341
IMG20141105102034
IMG20141105095049
IMG20141105101207
IMG20141105094831
IMG5172
IMG5156
IMG5118
IMG5086
IMG5051
IMG5072
brewer1966
brewer1950
brewer1933
Brewer2002
Brewer9
Brewer4
Brewer3
Brewer-Pond
Brewer3-2
Brewer1
Brewer-park
028
Brewer-Monitoring-Team
021
018

Information
Jennifer Lamoureux
Aquatic and Fish Habitat Biologist,
Rideau Valley Conservation Authority

613-692-3571 ext. 1108

December 20, 2016

Lake Level Monitoring

If you live on a lake and are interested in recording water levels (weekly or every two weeks) and feel you have a good location for a staff gauge to be placed (permanent dock, flat rock etc..) then we would appreciate your help in our monitoring levels on watershed lakes.

For more information, please contact:
Justin Robert
Hydrometric Data Coordinator
Department of Engineering and Regulation
Ext. 1194

December 14, 2016

2016 Deadlines

RVCA Property Inquiry Service Deadline

Friday, December 16 at 4 p.m. — if you require a property inquiry response before December 23, please submit on or before December 16.

Anything received after December 16 will be processed starting on Tuesday, January 3, 2017. 

Ottawa Septic Office Service Deadlines

Friday, December 16, 2016 at 4 p.m. – deadline for OSSO inspection requests

Monday, December 19 at 4 p.m. — deadlines to submit:

  • OSSO Part 8 Septic applications (new/replacement/alterations)
  • OSSO Septic Record Searches
  • ORWC OBC Part 8 registration

The Rideau Valley Conservation Authority (RVCA) partnered with the National Capital Commission (NCC) to design and construct a small wetland adjacent to the Ottawa River. This new wetland is located close to Remic Rapids along the Sir John A. Macdonald Parkway. The feature is 0.15 hectares and consists of a shallow basin that is a water supply for wildlife as well as amphibian breeding and bird foraging area. Volunteers and NGO community groups provided clean up and planting assistance. The wetland provides a unique and highly visible habitat feature along the National Capital Commission Ottawa River Pathway.

Benefits of the Project

  • Altered elevations creates areas for more diverse aquatic and terrestrial plant life
  • Provides new and enhanced habitat for wetland wildlife
  • Provides quiet area for water fowl and shorebird nesting, rearing and feeding
  • Installed woody structures creates more diverse habitat
  • Installed sand and pea stone creates turtle nesting and basking areas
  • Common buckthorn (invasive species) removal allowed for more native plant growth

Project Partners

ncc logo en

remic2
IMG20160617135857
IMG20160617135256
IMG20160617135123

Information

Jennifer Lamoureux
Aquatic and Fish Habitat Biologist,
Rideau Valley Conservation Authority

613-692-3571 ext. 1108

The Rideau Valley Conservation Authority, with their partners, has built a fish habitat embayment at the Richmond Conservation Area, located in Ottawa, Ontario. The project involved converting an existing grassed park area into a small wetland embayment along the shore of the Jock River. Raab Construction helped construct the wetland with the assistance of many dedicated volunteers.

Construction Highlights

  • 1,000 square metres of new spawning, nursery, rearing and feeding habitat created to support the 40 species of fish that reside in the Jock River
  • 9 days of construction took place in October 2014
  • 108 truckloads of fill were removed from the Jock River floodplain
  • 100 metres of new shoreline created by re-grading the existing slope and planting a shoreline buffer around the perimeter of the new embayment

In 2014, the Jock River Embayment Creation Project won the Top Canadian Fishing Industry Conservation Project Award.

Project Partners

  • Rideau Valley Conservation Authority
  • Fisheries and Oceans Canada — Recreational Fisheries Conservation Partnerships Program
  • Muskies Canada Ottawa Chapter
  • National Defence Fish and Game Club
  • Community Foundation of Ottawa
  • Ottawa Fly Fishers Society
  • Shell Fueling Change
  • Fendock

IMG20141020073201
IMG20141022161418
IMG20141024164131
IMG20141027163855
IMG20141029135457
IMG20141029104207
IMG20141029082650
IMG20141027142825
IMG20141027130142
IMG201410271115231
IMG20141029135431
IMG20160317093042
IMG20160317112459
IMG-20141118-00257
IMG-20141118-00256
Photo1051

Information
Jennifer Lamoureux
Aquatic and Fish Habitat Biologist,
Rideau Valley Conservation Authority

613-692-3571 ext. 1108

December 07, 2015

2015 Budget and Work Plan

Special guests and dignitaries gathered to celebrate 50 years of conservation at the Rideau Valley Conservation Authority’s Anniversary Celebration on November 30. Surrounded by watershed representatives, politicians, past and present staff along with numerous friends and partners, RVCA Board of Director Members looked to acknowledge the many people, projects and partnerships behind a conservation movement that started in the early 1940s.

“This was our opportunity to thank those who have helped us towards our goal of a thriving and sustainable watershed,” said Lyle Pederson, RVCA Chair and Elizabethtown-Kiltey representative. “Conservation of our land and water is not something you can do alone. It takes a great deal of municipal support along with many staff, partners and volunteers to get the job done.”

Ottawa Mayor Jim Watson was in attendance and spoke to the crowd of over 70. He reflected on Ottawa Mayor Don Reid’s drive to bring the then 41 watershed municipalities together to form a local Conservation Authority in March 1966. Mayor Watson praised the Board Members, staff and partners for their past and ongoing work.

Also in attendance was Rideau Valley Conservation Foundation Chair Jason Kelly who spoke of the continued support the Foundation has for the Authority’s on-the-ground efforts throughout the watershed. He took a moment to thank BMO for their support of the anniversary event and brought greetings and congratulations from Nepean-Carleton MPP Lisa MacLeod.

“Tonight was a wonderful opportunity to reconnect, reminisce and reflect on our many shared accomplishments,” said Master of Ceremonies and RVCA Vice Chair Ed Hand. “Now it is time to look forward to another 50 years of conservation — it’s time to get back to work so we have clean abundant water, natural shorelines, rich forests and wetlands, diverse habitat and sustainable land use.”

Page 78 of 112

Contact Us

Address:
Rideau Valley Conservation Authority
3889 Rideau Valley Drive
Manotick, Ontario K4M 1A5

Phone:
613-692-3571, 1-800-267-3504

Email:

Hours:

Regular Hours: Monday to Friday, 8:30 a.m. to 4:30 p.m.

Member of: conservation ontario